An accomplished results-driven Engineering professional with over (20) years of experience in civil works, Proven ability & leadership skills to handle a team of engineers, having an exposure to Operations, Exceptional communicator with demonstrated success- building relationships with the upper management in well-known institutions in Middle East. I feel my strengths would be better utilized in a role mixing both day-to-day supervision with more strategic orientation; I’m therefore looking for new interesting international challenges in General Supervision/civil engineering Service or similar.
Senior Civil Engineer
April 2021 – March 2024 Oman
Project Name: Reinforcement of Al-Dakhiliyah Water Transmission System Phase-02, Budget of Project:129 million OMR
Activities: -
Directly Responsible Engineer to follow up all the supervision works:
1.
BPS-02 with Two bolted GFS Tanks and capacity for each 10 m3 & CS pipeline1500 DN. The total Area of 23251 SQ. Main Pumping Stations (4 Pumps, total head 184,Capacity 2828m3/h), Electrical Buildings, Chlorination Building, Primary sub-station 33/11 K V, Guardhouse Building, Chlorination building, Air Compressor Room, Surge Vessel & All other utilities from road works, protections, Waterproofing (Epoxy, Bitumen & Membrane) Wastewater networks and septic tanks and Slope protection benches, technical advises, drawings review and creative the solutions for best performance with maintain the quality.
2.
BPS-03 with Two bolted GFS Tanks and capacity for each 8000 m3 & CS pipeline1400 DN.The total Area of 37244 SQ.M Pumping Station, (4 Pumps, total head 189,Capacity 2491m3/h),Electrical Building, Chlorination Building, Primary sub-station33/11 K V, Guardhouse Building, Chlorination building, Air Compressor Room, Surge Vessel,& All other utilities from road works, protections, Waterproofing, (Epoxy, Bitumen & Membrane) Wastewater networks and septic tanks and Slope protection benches, technical advises, drawings review and creative the solutions for best performance with maintain the quality.
Project Name: Barik -& Nahda 400/132 kV Grid Station. Budget of Project:
40 million OMR
Activities: -
Supervision and follow up all the civil & construction work from start to end such as an excavation, backfilling, RCC, Piles, and all the related Building Road Works with protection & Utilities.
1.
Full responsibility for inspection and RFI.
2.
Q.C for the construction works.
3.
Issuing the Reports (Daily, Weekly)
4.
Propose technical solutions.
5.
Solving the issues and creating the solutions.